Australia Post Parcel Sorting Facility

Chullora, NSW

Chullora, NSW Australia Post Parcel Sorting Facility

The Australia Post parcel sorting project at Chullora incorporated a major extension of the existing facility to accommodate the increased volume of parcel postage resulting from the online shopping boom. The project was completed under a fast track program of 28 weeks.

The $40 million extension includes the design and construction of an additional 15,000m² warehouse space which was connected to the existing operational facility.

The warehouse is a steel structure with low height pre-cast concrete walls, full height insulated wall panels with and an insulated panel roof. The warehouse floor is a mesh and fibre combination slab with a high-quality burnished finish. Building services include air-conditioning to the entire warehouse space with all major plant installed on platforms underneath the roof.  ADCO’s team also managed the integration of the specialist sortation equipment contract.

  • type

    Design & Construct

  • Value

    $40 million

  • period

    10 months

ADCO’S TEAM COORDINATED THE DESIGN AND CONSTRUCTION WORKS TO ACCOMMODATE THE INSTALLATION OF MAJOR MAIL SORTATION EQUIPMENT IMPORTED FROM THE NETHERLANDS.